Search Nevada County Historical Archive
Enter a name, company, place or keywords to search across this item. Then click "Search" (or hit Enter).
To search for an exact phrase, use "double quotes", but only after trying without quotes. To exclude results with a specific word, add dash before the word. Example: -Word.

Collection: Directories and Documents > Pamphlets

Environmental Impact Statement Draft - Highway 20 Between Penn Valley and Grass Valley (PH 16-4)(1973) (81 pages)

Go to the Archive Home
Go to Thumbnail View of this Item
Go to Single Page View of this Item
Download the Page Image
Copy the Page Text to the Clipboard
Don't highlight the search terms on the Image
Show the Page Image
Show the Image Page Text
Share this Page - Copy to the Clipboard
Reset View and Center Image
Zoom Out
Zoom In
Rotate Left
Rotate Right
Toggle Full Page View
Flip Image Horizontally
More Information About this Image
Get a Citation for Page or Image - Copy to the Clipboard
Go to the Previous Page (or Left Arrow key)
Go to the Next Page (or Right Arrow key)
Page: of 81  
Loading...
At PROJECT DESCRIPTION AND PURPOSE A. PROPOSED FACILITY The subject of this environmental impact statement is the proposed construction of a new freeway facility. The proposed project is approximately 6 miles long and replaces a portion of State Route 20 between Penn Valley and Grass Valley in Nevada County. State Route 20 is one of the few east-west routes across Northern California. It is described in the California Statutes as linking State Route 1 near Fort Bragg with U.S. Highway 101 at Willits, then further connecting with U.S. Interstate Route 80 near Emigrant Gap via Williams and Colusa. It winds its way through the Pacific Coast Mountain Range; follows a relatively straight path across the Central Valley; twists and turns through the Sierra Nevada foothills and ends in the high Sierras (see the inside front cover). Locally the proposed project is described as being between Penn Valley and Grass Valley. The alignment of the new highway is shown on the Title Map, Appendix C. The project is located in T.16N., R.7,8E. of the Mount Diablo base and meridian. The area of the project is included on the Rough and Ready and Grass Valley U.S.G.S. Quadrangle Maps. B. MAJOR DESIGN FEATURES Initially only two lanes will be built from Penn Valley to Scadden Flat (4.6 miles) with controlled access and an auxiliary lane for slow-moving uphill traffic. The remainder of the project (1.2 miles) will be constructed to full freeway standards. (See Title Map, Appendix C.) The proposed project is designed to accommodate full freeway standards including alignment, grade and access control. It is on new alignment such that the existing highway will provide for local access. l. Bridges and Interchanges One separation is proposed for the initial project, that is at the Brighton Street Interchange overcrossing. Two existing separation structures, the Mill Street Undercrossing and Route 20/49 (Empire Street) Interchange, will be modified to receive traffic from the alignment. The initial construction will provide for at-grade crossings at.