Search Nevada County Historical Archive
Enter a name, company, place or keywords to search across this item. Then click "Search" (or hit Enter).
To search for an exact phrase, use "double quotes", but only after trying without quotes. To exclude results with a specific word, add dash before the word. Example: -Word.

Collection: Maps > Nevada County Recorders Maps

Nevada County Recorders Parcel Maps Book 20 (259 images)

Go to the Archive Home
Go to Thumbnail View of this Item
Go to Single Page View of this Item
Download the Image
Copy the Page Text to the Clipboard
Don't highlight the search terms on the Image
Show the Page Image
Show the Image Page Text
Share this Page - Copy to the Clipboard
Reset View and Center Image
Zoom Out
Zoom In
Rotate Left
Rotate Right
Toggle Full Page View
Flip Image Horizontally
More Information About this Image
Get a Citation for Page or Image - Copy to the Clipboard
Go to the Previous Page (or Left Arrow key)
Go to the Next Page (or Right Arrow key)
Page: of 259  
Loading...
Parcel Map Book 20, pg. 59 (2008)
Catalog #: NC Recorders Map Parcel 20-059-3
Parcel Map 07-012. Riffey, Kent & Virginia. Parcel Map Book 12, pg. 136 Parcel 2. T14N R7E Sec. 12. Cole Rd.. Cole Ditch. Parcel Map Book 20, pg. 59. T14M R7E Sec. 12. NID Cole Ditch

Date: 2008, 2008
Scanned on: 2010-05-18 09:28:32
File Size: 5.60 MB
Dimensions (pixels): 7,817 x 5,725
Print Sizes:
  • 4" x 6" = 1954 dpi,
  • 5" x 7" = 1563 dpi,
  • 8" x 10" = 977 dpi
  • SUPPLEMENTAL _ INFORMATION 1. MITIGATION 1A: ALL NEW ABOVE-GROUND STRUCTURES SHALL BE LOCATED WITHIN EXISTING GRASSLAND OPENINGS SQ AS TO NOT ENCROACH INTO THE SENSITIVE RESOURCES IDENTIFIED IN THE BIOLOGICAL INVENTORY (APPROXIMATELY SHOWN ON SHEET 2) NOR SHALL THEY ENCROACH INTO THE AREA WITHIN THE SOUTHWESTERN PORTION OF PARCEL 2, WHICH IS DESIGNATED BY THE CALIFORNIA DEPARMENT OF CONSERVATION IMPORTANT FARMLANDS MAP AS "LOCALLY IMPORTANT FARMLAND”. THE BUILDING ENVELOPES SHALL NOT ENCROACH INTO THE SENSITIVE RESOURCE SETBACKS. 2. MITIGATION 4A THE FOLLOWING NOTES SHALL BE INCLUDED ON ALL GRADING AND IMPROVEMENT PLANS AND BUILDING PERMITS: ANY AREAS MAPPED AS WETLANDS, STREAMS, OR ARTIFICIALLY IRRIGATED WETLANDS SHALL BE DESIGNATED AS ENVIRONMENTALLY SENSITVE AREAS (ESAs) ON PLANS AND SPECIFICATIONS. THE PURPOSE OF THE ESAs IS TO MINIMIZE THE POTENTIAL FOR INADVERTENT IMPACTS TO THESE HABITATS AND TO REDUCE IMPACTS TO WATER QUALITY. THE ESAs SHALL BE DELINEATED ON THE GROUND WITH ORANGE SAFETY NETTING IF EARTHMOVING OR CONSTRUCTION IS PROPOSED WITHIN 50 FEET OF THESE FEATURES. DURING GRADING AND CONSTRUCTION ACTIVITIES, THE ESA FENCING SHALL BE INSTALLED AT LEAST 10 FEET FROM THE BOUNDARIES OF THESE FEATURES. NO EARTH-MOVING ACTIVITIES, VEHICLES, HEAVY EQUIPMENT, OR OTHER CONSTRUCTION SHALL BE PERMITTED WITHIN THE ESAs, UNLESS PART OF AN APPROVED MANAGEMENT PLAN. WITH THE EXCEPTION OF NID'S STANDARD MAINTENANCE AND MANAGEMENT OF THEIR CANALS, ANY CONSTRUCTION OR GRADING PROPOSED WITHIN 100 FEET OF THE WETLAND, 50 FEET OF THE SMALL STREAM, OR WITHIN 100 FEET OF THE CANAL WATER SURFACE ON THE UPHILL SIDE OF THE CANAL AND WITHIN 20 FEET FROM THE CANAL WATER SURFACE ON THE DOWNHILL SIDE OF THE CANAL WOULD TRIGGER THE REQUIREMENT FOR PREPARATION OF A MANAGEMENT PLAN TO ENSURE CONSISTENCY WITH NEVADA COUNTY LAND USE REGULATIONS. MITIGATION 4B IMPLEMENT BEST MANAGEMENT PRACTICES DURING AND AFTER CONSTRUCTION. THESE MEASURES SHALL BE INCORPORATED IN ALL FINAL GRADING AND CONSTRUCTION PLANS AND WILL INCLUDE THE FOLLOWING: A) PRIOR TO GRADING, CORRECTLY INSTALL SILT-FENCING, STRAW OR COIR LOGS OR ROLLS, OR OTHER SEDIMENT BARRIERS TO KEEP ERODIBLE SOILS OUT OF THE WETLAND SWALE, ARTIFICIAL WETLANDS, SEASONAL STREAM AND NID. CANAL. BEFORE THE FIRST HEAW RAINS AND PRIOR TO REMOVING THE BARRIERS, SOILS OR OTHER SEDIMENTS OR DEBRIS THAT ACCUMULATES BEHIND THE BARRIERS SHALL BE REMOVED AND TRANSPORTED AWAY FOR DISPOSAL. B) DISRUPTION OF DRAINAGES ADJACENT TO THE CONSTRUCTION SITE SHALL BE MINIMIZED; DISTURBED AREAS SHALL BE GRADED TO MINIMIZE SURFACE EROSION AND SILTATION TO THE DRAINAGE; BARE SOILS SHALL BE IMMEDIATELY STABILIZED AND REVEGETATED. SEEDED AREAS SHALL BE COVERED WITH BROADCAST STRAW, ANCHORED JUTE NETTING, OR BIODEGRADABLE EROSION CONTROL BLANKETS. IF STRAW IS USED FOR EROSION CONTROL, CERTIFIED WEED-FREE STRAW SHOULD BE UTILIZED TO MINIMIZE THE RISK OF INTRODUCTION OR SPREAD OF NOXIOUS WEEDS WITHIN THE PROJECT AREA OR ADJACENT PROPERTIES. C) THE CONTRACTOR SHALL EXERCISE EVERY REASONABLE PRECAUTION TO PROTECT THE WETLAND SWALE, ARTIFICALLY IRRIGATED WETLANDS, SEASONAL STREAM, NID CANAL AND SOILS AT THE PROJECT SITE FROM POLLUTION WITH FUELS, OILS, BITUMEN, CALCIUM CHLORIDE, AND OTHER HARMFUL MATERIALS. CONSTRUCTION BY-PRODUCTS AND POLLUTANTS SUCH AS OIL, CEMENT, AND WASH WATER SHALL BE PREVENTED FROM DISCHARGING INTO THE STREAM AND SHALL BE COLLECTED AND REMOVED FROM THE SITE. NO SLASH OR OTHER NATURAL DEBRIS SHALL BE PLACED IN OR ADJACENT TO THESE FEATURES. ALL CONSTRUCTION DEBRIS AND ASSOCIATED MATERIALS AND LITTER SHALL BE REMOVED FROM THE WORK SITE IMMEDIATELY UPON COMPLETION. 3. MITIGATION 5A ALTERNATIVES TO OPEN BURNING OF VEGETATIVE MATERIAL SHALL BE USED ON THE PROJECT SITE UNLESS DEEMED INFEASIBLE BY THE AIR POLLUTION CONTROL OFFICER. AMONG SUITABLE ATERNATIVES ARE CHIPPING, MULCHING, OR CONVERSION TO BIOMASS FUEL. ANY BURING ASSOCIATED WITH PROJECT DEVELOPMENT MUST BE DONE UNDER THE AUTHORITY OF AN AIR POLLUTION PERMIT FROM THE NORTHERN SIERRA AIR QUALITY MANAGEMENT DISTRICT (NSAQMD). PRIOR TO APPROVAL OF IMPROVEMENT OR GRADING PLANS FOR DRIVEWAY OR ROAD CONSTRUCTION, AN APPROVAL LETTER FROM THE NSAQMD SHALL BE OBTAINED, INDICATING THE APPROVED METHOD OF CLEARED VEGETATION DISPOSAL. SUCH METHODS SHALL BE NOTED ON THE IMPROVEMENT OR GRADING PLANS. AT NO TIME SHALL OPEN BURNING OF MATERIALS GENERATED BY THIS PROJECT OCCUR AT ANOTHER SITE UNLESS APPROVED IN ADVANCE BY THE NSAQMD. MITIGATION 5B: A DUST CONTROL PLAN MUST BE SUBMITTED TO AND APPROVED BY THE AIR POLLUTION CONTROL OFFICER BEFORE TOPSOIL IS DISTURBED ON ANY PROJECT WHERE MORE THAN ONE ACRE OF NATURAL SURFACE AREA IS TO BE ALTERED OR WHERE THE NATURAL GROUND COVER IS REMOVED. THE DISTURBANCE OF TOPSOIL INCLUDES ANY CLEARING OR GRADING . THE DUST CONTROL PLAN IS TYPICALLY FULFILLED BY CLEARLY PHRASED AND ENFORCEABLE CONDITIONS INCLUDED ON THE PROJECT GRADING PLAN, PREFERABLY UNDER ITS OWN HEADING. MITIGATION 5C: THIS SITE IS NOT MAPPED AS HAVING ULTRAMAFIC ROCK/SERPENTINE, AND IS THEREFORE NOT SUBJECT 10 THE ASBESTOS ATCM FOR CONTRUCTION UNLESS ULTRAMAFIC ROCK IS SUBSEQUENTLY DETERMINED TO EXIST ON THE PROJECT SITE, IN WHICH CASE, THE DISTRICT MUST BE CONTACTED NO LATER THAN THE FOLLOWING BUSINESS DAY. 4, MITIGATION 7A NESTING RAPTORS AND MIGRATORY BIRDS: POTENTIAL IMPACTS TO NESTING RAPTORS AND MIGRATORY BIRDS CAN BE AVOIDED BY REMOVING TREES ONLY DURING THE NON-BREEDING SEASON (AUGUST 1 THROUGH FEBRUARY 29). ALTERNATIVELY, PRE-CONSTRUCTION SURVEYS BY A QUALIFIED WILDLIFE BIOLOGIST CAN BE CONDUCTED TO VERIFY THAT THE CONSTRUCTION/SITE DISTURBANCE ZONE DOES NOT SUPPORT NESTING MIGRATORY BIRDS IF TREE REMOVAL MUST OCCUR DURING THE NESTING SEASON (MARCH 1 JULY 31). SURVEYS FOR NESTING RAPTORS AND MIGRATORY BIRDS, INCLUDING A FOCUSED SURVEY FOR COOPER'S HAWK, ARE REQUIRED PRIOR TO ANY CONSTRUCTION-RELATED ACTIVITIES OR OTHER SITE DISTURBANCES INITIATED DURING THE BREEDING SEASON. SURVEYS SHALL BE CONDUCTED NO SOONER THAN TWO WEEKS PRIOR TO THE INITIATION OF CONSTRUCTION ACTIVITIES OR OTHER SITE DISTURBANCES. AN ADDITIONAL SURVEY MAY BE REQUIRED IF PERIODS OF CONSTRUCTION INACTIVITY (E.C., GAPS OF ACTIVITY DURING GRADING, TREE REMOVAL, ROAD BUILDING, OR STRUCTURE ASSEMBLY) EXCEED A PERIOD OF THREE WEEKS, AN INTERVAL DURING WHICH BIRD SPECIES, IN THE ABSENCE OF HUMAN OR CONSTRUCTION RELATED DISTURBANCES, MAY ESTABLISH A NESTING TERRITORY AND INITIATE EGG LAYING AND INCUBATION. SHOULD ANY ACTIVE NESTS OR BREEDING AREAS BE DISCOVERED, A BUFFER ZONE (PROTECTED AREA SURROUNDING THE NEST, THE SIZE OF WHICH IS TO BE DETERMINED BY A QUALIFIED BIOLOGIST) AND MONITORING PLAN, IF NEEDED, SHALL BE DEVELOPED, NEST LOCATIONS SHALL BE MAPPED AND SUBMITTED, ALONG WITH A
    REPORT STATING THE SURVEY RESULTS, TO THE NEVADA COUNTY PLANNING DEPARTMENT WITHIN ONE WEEK OF SURVEY COMPLETION. A QUALIFIED WILDLIFE BIOLOGIST SHALL MONITOR THE PROGRESSION OF REPRODUCTIVE STAGES OF ANY ACTIVE NESTS UNTIL A DETERMINATION IS MADE THAT NESTLINGS HAVE FLEDGED AND THAT A SUFFICIENT TIME FOR FLEDGLING DISPERSAL HAS ELAPSED; CONSTRUCTION ACTIVITIES SHALL BE PROHIBITED WITHIN THE BUFFER ZONE UNTIL SUCH DETERMINATION IS MADE. MITIGATION 7B: TO AVOID POTENTIAL DIRECT HARM TO PRESERVED OAKS AND OAK GROVES DURING CONSTRUCTION, AND TO MINIMIZE INDIRECT IMPACTS TO OAKS FOLLOWING CONSTRUCTION, THE FOLLOWING MITIGATION MEASURES SHALL BE IMPLEMENTED DURING CONSTRUCTION FOR OAKS TO BE RETAINED: 1. ESTABLISH ANY LANDMARK OAK GROVES ADJACENT TO CONSTRUCTION AS ENVIRONMENTALLY SENSITIVE AREAS DURING CONSTRUCTION. THE BOUNDARIES OF THE OAK ESA’S SHALL BE ESTABLISHED AT THE DRIPLINE OF THE OAK GROVES. THE ESA’S SHALL BE SHOWN ON PLANS AND SPECIFICATIONS SHOWN TO CONTRACTORS. 2. PLANS AND SPECIFICATIONS SHALL CLEARLY STATE PROTECTION PROCEDURES FOR OAKS TO BE PRESERVED ON THE PROJECT SITE. THE SPECIFICATIONS SHOULD ALSO REQUIRE CONTRACTORS 10 STAY WITHIN DESIGNATED WORK AREAS AND SHALL INCLUDE A PROVISION FOR PENALTIES IF OAK TREES ARE DAMAGED UNINTENTIONALLY. 3. THE FOLLOWING ACTIVITIES SHALL NOT OCCUR WITHIN THE DRIPLINES OF OAKS WITHIN THE LANDMARK GROVES: A) NO VEHICLES, CONSTRUCTION EQUIPMENT, MOBILE OFFICES, OR MATERIALS SHOULD BE PARKED OR LOCATED WITHIN THE DRIPLINES. B) NO IRRIGATION, OR ORNAMENTAL PLANTINGS REQUIRING IRRIGATION, SHALL BE INSTALLED. MULCHES OR DROUGHT—TOLERANT, NON-IRRIGATED PLANTINGS ARE SUITABLE WITHIN THE DRIPLINE C) SOIL SURFACE REMOVAL GREATER THAN ONE FOOT SHALL NOT OCCUR. D) NO CUTS OR TRENCHING SHALL OCCUR. IF THESE AREAS CANNOT BE AVOIDED, THEN THE TREE SHALL BE ADDED TO THE LIST OF OAKS TO BE REPLACED THROUGH AN ON-SITE PLANTING. E) EARTHEN FILL GREATER THAN ONE FOOT DEEP SHALL NOT BE PLACED, AND NO FILL SHALL BE PLACED WITHIN FIVE FEET OF THEIR TRUNKS, EXCEPT FOR THOSE TREES MARKED FOR MITIGATION. F) NO PAVING SHALL BE PLACED. G) NO UNDERGROUND UTILITY LINE TRENCHING. IF IT IS ABSOLUTELY NECESSARY TO INSTALL UNDERGROUND UTILITIES, THE TRENCH SHALL NOT BE DUG WITHIN FIVE FEET OF THE TRUNK TO AVOID KILLING OR WEAKENING THE TREE. 4. A COPY OF THE PUBLICATION "LIVING AMONG THE OAKS: A MANAGEMENT GUIDE FOR LANDOWNERS” (APPENDIX H OF THE BIOLGICAL INVENTORY PREPARED FOR THIS PROJECT) SHALL BE PROVIDED BY THE SELLER TO NEW LANDOWNERS UPON SALE OF THE LOTS. 9. IF CONSTRUCTION WOULD REMOVE MORE THAN A SMALL NUMBER OF OAKS, A MANAGEMENT PLAN MUST BE PREPARED TO ENSURE CONSISTENCY WITH NEVADA COUNTY LAND USE REGULATIONS GOVERNING THE PROTECTION OF OAK RESOURCES. THE PLAN WOULD INCLUDE MEASURES FOR COMPENSATING OAK LOSSES THROUGH RESTORATION OR REPLACEMENT PLANTING, AND SPECIFICATIONS FOR IMPLEMENTATION, MAINTENANCE, AND MONITORING, AND A CONTINGENCY PLAN AS NECESSARY TO ENSURE MITIGATION SUCCESS. 5, MITIGATION 144: THE DOCUMENT NUMBER FOR THE “NEVADA COUNTY RIGHT TO FARM DISCLOSURE” FOR PARCEL 2 BEING RECORDED CONCURRENTLY WITH THIS MAP IS: DOC. NO. 2008-00 7.2lo4 6. MITIGATION 154 CULTURAL RESOURCES: ALL IMPROVEMENT PLANS/GRADING/CONSTRUCTION PLANS SHALL ADVISE CONTRACTORS AND CONSTRUCTION PERSONNEL INVOLVED IN ANY FORM OF GROUND DISTURBANCE, IE. UTILITY PLACEMENT OR MAINTENANCE, GRADING, ETC., OF THE REMOTE POSSIBILITY OF ENCOUNTERING SUBSURFACE CULTURAL RESOURCES. IF SUCH RESOURCES ARE ENCOUNTERED OR SUSPECTED, WORK SHALL BE HALTED IMMEDIATELY AND THE PLANNING DEPARTMENT CONTACTED. A PROFESSIONAL ARCHAEOLOGIST SHALL BE CONSULTED TO ACCESS ANY DISCOVERIES AND DEVELOP APPROPRIATE MANAGEMENT RECOMMENDATIONS FOR ARCHAEOLOGICAL RESOURCE TREATMENT. IF HUMAN BONE IS ENCOUNTERED, CALIFORNIA LAW REQUIRES THAT THE NEVADA COUNTY CORORNER AND THE NATIVE AMERICAN HERITAGE COMMISSION BE CONTACTED AND, IF NATIVE AMERICAN RESOURCES ARE INVOLVED, NATIVE AMERICAN ORGANIZATIONS AND INDIVIDUALS RECOGNIZED BY THE COUNTY SHALL BE NOTIFIED AND CONSULTED ABOUT ANY PLANS FOR TREATMENT. 7. A ROAD IMPROVEMENT FEE IN ACCORDANCE WITH NEVADA COUNTY ORDINANCE NO. 1829, CREATING AND ESTABLISHING THE AUTHORITY FOR IMPOSING AND CHARGING A ROAD IMPROVEMENT FEE WITH THE UNINCORPORATED TERRITORY OF NEVADA COUNTY, WILL BE LEVIED AT THE ISSUANCE OF BUILDING PERMITS FOR EACH PARCEL CREATED BY THE MAP, AND WILL BE BASED ON THE LATEST FEE SCHEDULE ADOPTED BY THE NEVADA COUNTY BOARD OF SUPERVISORS. A ROAD MAINTENANCE AGREEMENT FOR COLE ROAD IS ON FILE, RECORDED AS DOCUMENT NUMBER: 2008-000 9265 8. THERE RECORDED MAP. THERE IS NO GUARANTEE THAT WATER IS AVAILABLE ON ANY LOT OR PARCEL ON THE RECORDED MAP. 9, NEVADA IRRIGATION DISTRICT NOTES: REGARDING THE ENCROACHMENT PERMIT FOR THE EXISTING GRAVEL DRIVEWAY CROSSING THE CANAL ON PARCEL 2: "CANAL ENCROACHMENT PERMIT (EP#1839) PER DOCUMENT NUMBER 2006-29002, NEVADA COUNTY RECORDS”. REGARDING THE SPILL CHANNEL CROSSING THE SOUTHEAST CORNER OF THE PROJECT: "NID UTILIZES THIS CHANNEL TO SPILL WATER WITHOUT NOTIFICATION OR WARNING TO THE AFFECTED DOWNSTREAM PROPERTY OWNERS.” IS NO GUARANTEE THAT SEWAGE CAN BE DISPOSED OF ON ANY LOT OR PARCEL OF THE SUPPLEMENTAL PROPERTY INFORMATION RELATIVE TQ PARCEL MAP NO. 07-012 FOR KENT & VIRGINIA RIFFEY Being a portion of the W.1/2 OF SECTION 13, T.14N., R.QE., M.D.M. Within the unincorporated Territory of NEVADA COUNTY, CALIFORNIA scale: 1 200 October, 2007 CASTON LAND SURVEYING P. O. Box 1385, Grass Valley, California SHEET 3 OF 3 SHEETS PM 20)54