Enter a name, company, place or keywords to search across this item. Then click "Search" (or hit Enter).
Collection: Maps > Nevada County Recorders Maps
Nevada County Recorders Parcel Maps Book 20 (259 images)

Copy the Page Text to the Clipboard

Show the Page Image

Show the Image Page Text


More Information About this Image

Get a Citation for Page or Image - Copy to the Clipboard

Go to the Previous Page (or Left Arrow key)

Go to the Next Page (or Right Arrow key)
Page: of 259

Parcel Map Book 20, pg. 79 (2008)
Catalog #: NC Recorders Map Parcel 20-079-4
Catalog #: NC Recorders Map Parcel 20-079-4
Parcel Map 07-33. T16N R8E Sec. 1. Pachaud, Emerson. Peterson, Lerry. Rainey, Michael. Canal, Red Hill. Wet Hill Rd.. Sierra Springs Rd.. Parcel Map Book 20, pg. 79. NID Red Hill Canal. Pachaud-Peterson-Rainey
Date: 2008, 2008
Scanned on: 2010-05-18 09:28:40
File Size: 6.44 MB
Dimensions (pixels): 7,800 x 5,400
Print Sizes:
4" x 6" = 1950 dpi,
5" x 7" = 1560 dpi,
8" x 10" = 975 dpi
Date: 2008, 2008
Scanned on: 2010-05-18 09:28:40
File Size: 6.44 MB
Dimensions (pixels): 7,800 x 5,400
Print Sizes:
CONSOLIDATED FIRE DISTRICT AIR QUALITY BIOLOGICAL RESOURCES
APPROVED ADDRESS NUMBERS SHALL BE PROVIDED FOR EACH PARCEL
IN SUCH A MANNER AS TO BE CLEARLY VISIBLE AND LEGIBLE FROM THE
STREET ASSOCIATED WITH THE ADDRESS. THE NUMBERS SHALL BE
LIGHT—REFLECTIVE AND SHALL SHARPLY CONTRAST WITH THEIR
BACKGROUND, BE A MINIMUM OF 4 INCHES IN HEIGHT, AND MOUNTED
ON A NONCOMBUSTIBLE SURFACE. iF THE ADDRESS SIGN IS MOUNTED
ON A POST, THE POST SHALL ALSO BE NONCOMBUSTBLE. AN ADDRESS
POSTED ON A MAIL BOX IS NOT ACCEPTABLE.
GEOLOGY / SOIL
GEOLOGY/SOILS: TO OFFSET THE POTENTIAL IMPACTS TO GEOLOGY AND
SOILS, THE FOLLOWING MITIGATION MEASURES SHALL BE REQUIRED AND
SHALL BE PLACED ON ALL GRADING/IMPROVEMENT PLANS:
MITIGATION MEASURE 3A: EROSION CONTROL MEASURES AND BEST
MANAGEMENT PRACTICES AS IDENTIFIED IN MITIGATION MEASURE 4A SHALL
BE IMPLEMENTED TO STABILIZE AREAS DISTURBED FOR ROAD
IMPROVEMENTS AND DRIVEWAY CONSTRUCTION OR OTHER SITE
IMPROVEMENTS. PRIOR TO ANY ONSITE DISTURBANCE, THE NEVADA
COUNTY BUILDING DEPARTMENT SHALL DETERMINE IF A GRADING PERMIT
IS REQUIRED.
MITIGATION MEASURE 3B: GRADING PLANS SHALL INCLUDE THE TIME OF
YEAR FOR CONSTRUCTION ACTIVITIES. NO CONSTRUCTION SHALL OCCUR
AFTER OCTOBER 15 OR BEFORE MAY 15 UNLESS THE CHIEF BUILDING
INSPECTOR, OR HIS/HER AUTHORIZED AGENT, DETERMINES PROJECT SOIL
CONDITIONS TO BE ADEQUATE TO ACCOMMODATE CONSTRUCTION
ACTIVITIES. IN ORDER TO MAKE THIS DETERMINATION, THE SOIL MUST
NOT BE OVERSATURATED, AND THE CONTRACTOR MUST IMPLEMENT
EROSION CONTROL MEASURES AT THE END OF EACH CONSTRUCTION DAY.
HYDROLOGY / WATER QUALITY
HYDROLOGY/WATER QUALITY: TO MINIMIZE POTENTIAL INDIRECT IMPACTS
TO WATER QUALITY RESULTING FROM PLACEMENT OF FILL WITHIN ONE OR
BOTH OF THE TWO ONSITE SWALES, THE FOLLOWING MITIGATION
MEASURES ARE REQUIRED. THE FOLLOWING NOTES SHALL BE INCLUDED
ON ALL GRADING/IMPROVEMENT PLANS.
MITIGATION MEASURE 4A: IMPLEMENT BEST MANAGEMENT PRACTICES
DURING CONSTRUCTION. TO PROTECT WATER QUALITY, THE CONTRACTOR
SHALL IMPLEMENT THE FOLLOWING BMPS DURING AND AFTER
CONSTRUCTION. THESE MEASURES INCLUDE, BUT ARE NOT LIMITED TO:
1, DISRUPTION OF SOILS AND NATIVE VEGETATION SHALL BE MINIMIZED;
DISTURBED AREAS SHALL BE GRADED TO MINIMIZE SURFACE EROSION
AND SILTATION; BARE SOILS SHALL BE IMMEDIATELY STABILIZED AND
REVEGETATED. SEEDED AREAS SHALL BE COVERED WITH BROADCAST
STRAW OR MULCH.
2. IF STRAW BALES ARE USED FOR EROSION CONTROL, OR IF STRAW IS
BROADCAST OVER SEEDED AREAS, ONLY CERTIFIED WEED-FREE STRAW
OR RICE STRAW SHALL BE UTILIZED TO MINIMIZE THE RISK OF
INTRODUCING OR SPREADING NOXIOUS WEEDS SUCH AS YELLOW STAR
THISTLE OR ITALIAN THISTLE:
J. THE CONTRACTOR SHALL EXERCISE EVERY REASONABLE PRECAUTION
TO PROTECT THE STREAM FROM POLLUTION WITH FUELS, OILS, BITUMEN,
CALCIUM CHLORIDE, AND OTHER HARMFUL MATERIALS. CONSTRUCTION
BYPRODUCTS AND POLLUTANTS SUCH AS OIL, CEMENT, AND WASH WATER
SHALL BE PREVENTED FROM DISCHARGING INTO OR NEAR THIS
RESOURCE AND SHALL BE COLLECTED AND REMOVED FROM THE SITE.
ALL CONSTRUCTION DEBRIS AND ASSOCIATED MATERIALS AND LITTER
SHALL BE REMOVED FROM THE WORK SITE IMMEDIATELY UPON
COMPLETION.
NEVADA IRRIGATION DISTRICT (NID)
"INSTALLATION OR CONSTRUCTION OF IMPROVEMENTS BELOW THE RED
HILL CANAL MAY BE SUSCEPTIBLE TO SURFACE OR SUBSURFACE
SEEPAGE OR DRAINAGE. NID RECOMMENDS ENCASEMENT (PIPING) OF
THE RED HILL CANAL PRIOR TO THE INSTALLATION OR CONSTRUCTION OF
IMPROVEMENTS BELOW THE CANAL. DAMAGES RESULTING FROM WATER
ESCAPING THE RED HILL CANAL ARE THOSE OF THE PROPERTY OWNER,
THEIR HEIRS, SUCCESSORS IN INTEREST, OR ASSIGNS, AND NOT NID.”
"WORK WITHIN STRUCTURAL PROXIMITY TO NID’S RED HILL CANAL OR
WITHIN THE DISTRICT'S EASEMENT, REQUIRES NID APPROVAL.”
AIR QUALITY: TO PREVENT POTENTIALLY ADVERSE IMPACTS TO AIR QUALITY
ASSOCIATED WITH VEGETATION CLEARANCE, OPEN BURNING, VEHICLE
EMISSIONS, AND DUST CONTROL, THE FOLLOWING MITIGATION MEASURES
SHALL BE REQUIRED AND SHALL BE SHOWN ON ALL
GRADING/IMPROVEMENT PLANS AND BUILDING PERMITS:
MITIGATION MEASURE 5A: COMPLY WITH OPEN BURNING PROHIBITIONS.
THE PROJECT APPLICANT SHALL USE ALTERNATIVES TO OPEN BURNING OF
VEGETATIVE MATERIAL ON THE PROJECT SITE. CLEARED VEGETATION SHALL
BE TREATED BY LEGAL MEANS OTHER THAN OPEN BURNING, SUCH AS
CHIPPING, SHREDDING, GRINDING, USE AS FIREWOOD, AND CONVERSION TO
BIOMASS FUEL. PRIOR TO APPROVAL OF IMPROVEMENT OR GRADING
PLANS FOR DRIVEWAY OR ROAD CONSTRUCTION, AN APPROVAL LETTER
FROM THE NSAQMD SHALL BE OBTAINED, INDICATING THE APPROVED
METHOD OF CLEARED VEGETATION DISPOSAL. SUCH METHODS SHALL BE
NOTED ON THE IMPROVEMENT PLANS PRIOR TO APPROVAL. AT NO TIME
SHALL OPEN BURNING OF MATERIALS GENERATED BY THIS PROJECT OCCUR
AT ANOTHER SITE.
MITIGATION MEASURE 5B: COMPLY WITH THE ASBESTOS AIRBORNE TOXIC
CONTROL MEASURE (ACTM) FOR CONSTRUCTION. IF SERPENTINE,
ULTRAMAFIC ROCK, OR NATURALLY OCCURRING ASBESTOS IS DISCOVERED
DURING CONSTRUCTION OR GRADING, THE NSAQMD SHALL BE NOTIFIED NO
LATER THAN THE FOLLOWING BUSINESS DAY AND SPECIFIC REQUIREMENTS
CONTAINED IN SECTION 93105 OF TITLE 17 OF THE CALIFORNIA CODE OF
REGULATIONS SHALL BE STRICTLY COMPLIED WITH.
MITIGATION MEASURE 5C: PREPARE A DUST CONTROL PLAN FOR PROJECT
CONSTRUCTION. PRIOR TO ISSUANCE OF GRADING PERMITS, THE PROJECT
APPLICANT SHALL PREPARE A DUST CONTROL PLAN FOR THE REVIEW AND
APPROVAL OF THE NORTHERN SIERRA AIR QUALITY MANAGEMENT DISTRICT
IF MORE THAN ONE (1) ACRE OF NATURAL SURFACE AREA IS TO BE
ALTERED OR WHERE THE NATURAL GROUND COVER IS REMOVED. THE
DISTURBANCE OF TOPSOIL INCLUDES ANY CLEARING OR GRADING. THE
CONDITIONS OF THE DUST CONTROL PLAN SHALL BE INCLUDED ON THE
PROJECT GRADING PLANS, UNDER THEIR OWN HEADING. THESE
CONDITIONS MAY INCLUDE BUT NOT BE LIMITED TO THE FOLLOWING:
WATERING OR COVERING STOCKPILES, LIMITING TRAFFIC SPEED TO 15 MPH
ON UNPAVED ROADS, APPLYING A DUST PALLIATIVE TO CONSTRUCTION
ROUTES, HALTING CONSTRUCTION IN EXCESSIVE WINDS (OVER 20 MPH),
SWEEPING OR WASHING CONSTRUCTION ROUTES, AND RE-ESTABLISHING
GROUNDCOVERS THROUGH SEEDING AND WATERING.
MITIGATION MEASURE 5D: CONTROL EXHAUST EMISSIONS. PORTABLE
ENGINES AND EQUIPMENT SHALL MEET THE FOLLOWING REQUIREMENIS *
PURSUANT TO NSAQMD AND CALIFORNIA AIR RESOURCES BOARD (CARB) ~
REQUIREMENTS: ANY EQUIPMENT WITH A PORTABLE ENGINE ATTACHED
HAVING A BRAKE HORSEPOWER RATING OF 50 OR MORE, THAT DOES NOT
PROVIDE MOTIVE POWER TO A VEHICLE, /S REQUIRED TO HAVE EITHER A
PERMIT FROM THE NSAQMD OR, IF THE ENGINE IS PORTABLE, MAY INSTEAD
HAVE A PORTABLE EQUIPMENT REGISTRATION PROGRAM (PERP)
REGISTRATION ISSUED BY THE CARB. IN ADDITION TO ENGINES, ANY
ANCILLARY EQUIPMENT THAT EMITS POLLUTANTS TO THE AIR EXCEEDING 2
POUNDS PER DAY SHALL ALSO BE REGISTERED UNDER PERP, OTHERWISE,
A SEPARATE NSAQMD PERMIT SHALL BE REQUIRED FOR OPERATIONS IN
NEVADA COUNTY. NSAQMD AND CARB PERMITS INCLUDE CONDITIONS THAT
LIMIT PRODUCTION, FUEL USAGE, AND DUST AND NOX EMISSIONS, AND
REQUIRE THAT CONSTRUCTION EQUIPMENT MEET STATE STANDARDS.
CULTURAL _R R
a
BIOLOGICAL RESOURCES (CONTINUED)
CULTURAL RESOURCES: THE FOLLOWING NOTE SHALL BE PLACED ON THE
SUPPLEMENTAL MAP AND INCORPORATED INTO BUILDING AND GRADING
PLANS:
‘ALL CONSTRUCTION PLANS SHALL ADVISE CONTRACTORS AND
CONSTRUCTION PERSONNEL INVOLVED IN ANY FORM OF GROUND
DISTURBANCE, 1.E. UTILITY PLACEMENT OR MAINTENANCE, GRADING, ETC.,
OF THE POSSIBILITY OF ENCOUNTERING SUBSURFACE CULTURAL ;
RESOURCES. IF SUCH RESOURCES ARE ENCOUNTERED OR SUSPECTED,
WORK SHALL BE HALTED IMMEDIATELY AND THE PLANNING DEPARTMENT ©
CONTACTED. A PROFESSIONAL ARCHAEOLOGIST SHALL BE CONSULTED TO
ACCESS ANY DISCOVERIES AND DEVELOP APPROPRIATE MANAGEMENT
RECOMMENDATIONS FOR ARCHAEOLOGICAL RESOURCE TREATMENT. iF
HUMAN BONE IS ENCOUNTERED, CALIFORNIA LAW REQUIRES THAT THE
NEVADA COUNTY CORONER AND THE NATIVE AMERICAN HERITAGE
COMMISSION BE CONTACTED AND, IF NATIVE AMERICAN RESOURCES ARE
INVOLVED, NATIVE AMERICAN ORGANIZATIONS AND INDIVIDUALS RECOGNIZED
BY THE COUNTY SHALL BE NOTIFIED AND CONSULTED ABOUT ANY PLANS
FOR TREATMENT.”
NOISE:
NOISE: THE FOLLOWING MITIGATION MEASURE SHALL BE INCLUDED AS A
NOTE ON ALL GRADING/IMPROVEMENT PLANS:
MITIGATION MEASURE 10A: LIMIT CONSTRUCTION ACTIVITIES TO REDUCE
NOISE IMPACTS. HOURS OF OPERATION FOR CONSTRUCTION ACTIVITIES
SHALL BE LIMITED TO THE HOURS OF 7 AM. TO 7 P.M. MONDAY THROUGH
SATURDAY. THESE LIMITED HOURS OF OPERATION SHALL BE NOTED ON
GRADING AND IMPROVEMENT PLANS, WHICH SHALL BE REVIEWED AND
APPROVED BY THE PLANNING DEPARTMENT PRIOR TO PERMIT ISSUANCE.
BIOLOGICAL RESOURCES: TO OFFSET THE POTENTIAL IMPACTS TO NESTING
RAPTORS OR OTHER MIGRATORY BIRDS AND LANDMARK OAK GROVES, THE
FOLLOWING MITIGATION MEASURE SHALL BE REQUIRED AND THE FOLLOWING
NOTES SHALL BE PLACED ON THE SUPPLEMENTAL INFORMATION PAGE OF THE
RECORDED MAP AND ON ALL GRADING/IMPROVEMENT PLANS AND BUILDING
PERMITS:
MITIGATION MEASURE 7A: AVOID IMPACTS TO NESTING RAPTORS AND
MIGRATORY BIRDS. TREE REMOVAL AND VEGETATION DISTURBANCE SHALL BE
AVOIDED DURING THE NESTING SEASON (MARCH 1 ~ JULY 31), IF POSSIBLE,
TO PREVENT IMPACTS TO NESTING MIGRATORY AND RESIDENT BIRDS. IF
CONSTRUCTION ACTIVITIES CANNOT BE AVOIDED DURING THE NESTING SEASON,
PRE-CONSTRUCTION SURVEYS SHALL BE CONDUCTED TO VERIFY THAT THE
CONSTRUCTION AND POTENTIAL DISTURBANCE ZONES DO NOT SUPPORT
NESTING MIGRATORY BIRDS:
1, TREE REMOVAL SHALL NOT TAKE PLACE DURING THE BREEDING SEASON
(MARCH 1 -— JULY 31), UNLESS SUPPORTED BY A REPORT FROM A QUALIFIED
BIOLOGIST TO VERIFY THAT BIRDS, INCLUDING RAPTORS, ARE NOT NESTING IN
THE TREES PROPOSED FOR REMOVAL OR DISTURBANCE.
2. AN ADDITIONAL SURVEY MAY BE REQUIRED IF PERIODS OF CONSTRUCTION
INACTIVITY (E.G. GAPS OF ACTIVITY DURING GRADING, TREE REMOVAL, ROAD
BUILDING OR STRUCTURE ASSEMBLY) EXCEED A PERIOD OF TWO WEEKS, AN
INTERVAL DURING WHICH BIRD SPECIES, IN THE ABSENCE OF HUMAN OR
CONSTRUCTION—RELATED DISTURBANCES, MAY ESTABLISH A NESTING TERRITORY
AND INITIATE EGG LAYING AND INCUBATION.
J. SURVEYS SHALL BE CONDUCTED NO SOONER THAN 14 DAYS PRIOR TO THE
INITIATION OF CONSTRUCTION ACTIVITIES OR OTHER SITE DISTURBANCES.
4, SHOULD ANY ACTIVE NESTS OR BREEDING AREAS BE DISCOVERED, A
BUFFER ZONE (PROTECTED AREA SURROUNDING THE NEST, THE SIZE OF WHICH
IS TO BE DETERMINED BY A QUALIFIED BIOLOGIST) AND MONITORING PLAN
SHALL BE DEVELOPED. NEST LOCATIONS SHALL BE MAPPED AND SUBMITTED,
ALONG WITH A REPORT STATING THE SURVEY RESULTS, TO THE NEVADA
COUNTY PLANNING DEPARTMENT WITHIN ONE WEEK OF SURVEY COMPLETION.
5. A QUALIFIED WILDLIFE BIOLOGIST SHALL MONITOR THE PROGRESSION OF
REPRODUCTIVE STAGES OF ANY ACTIVE NESTS DISCOVERED DURING THE
PRECONSTRUCTION SURVEY UNTIL A DETERMINATION IS MADE THAT NESTLINGS
HAD FLEDGED AND THAT A SUFFICIENT TIME FOR FLEDGLING DISPERSAL HAS
ELAPSED; CONSTRUCTION ACTIVITIES SHALL BE PROHIBITED WITHIN THE BUFFER
ZONE UNTIL SUCH DETERMINATION IS MADE.
MITIGATION MEASURE 7B. AVOID AND MINIMIZE CONSTRUCTION IMPACTS TO
OAKS. THE FOLLOWING MEASURES SHALL BE IMPLEMENTED DURING THE
CONSTRUCTION PHASE OF DEVELOPMENT AND SHOWN ON ALL
GRADING/IMPROVEMENT PLANS:
A) ESTABLISH THE LANDMARK OAK GROVES ADJACENT TO CONSTRUCTION AS
ENVIRONMENTALLY SENSITIVE AREAS (ESAS) DURING CONSTRUCTION. THE
BOUNDARIES OF THE OAK ESAS SHALL BE ESTABLISHED AT THE -DRIPLINE OF
THE OAKS OR OAK GROVES AS SHOWN IN THE OCTOBER 8, 2007, OAK
MANAGEMENT PLAN: PETERSON LOT SPLIT PREPARED BY SUSAN SANDERS
ENVIRONMENTAL CONSULTING. THE ESA BOUNDARIES SHALL BE SHOWN ON
PLANS AND SPECIFICATIONS USED BY CONTRACTORS.
B) OUTSIDE OF THE PERMITTED MUSDA CONSTRUCTION AREA, THE GRADE
SHALL NOT BE LOWERED WITHIN THE DRIP LINES OF OAKS TO BE PRESERVED.
IF THIS AREA CANNOT BE AVOIDED, THEN THE TREE(S) SHALL BE ADDED TO A
LIST OF OAKS TO BE MITIGATED THROUGH REPLACEMENT OR RESTORATION.
C) PLANS AND SPECIFICATIONS SHALL CLEARLY STATE PROTECTION
PROCEDURES FOR OAKS TO BE PRESERVED ON THE PROJECT SITE. THE
SPECIFICATIONS SHALL ALSO REQUIRE CONTRACTORS TO STAY WITHIN
DESIGNATED WORK AREAS.
D) VEHICLES, CONSTRUCTION EQUIPMENT, MOBILE OFFICES, OR MATERIALS
SH4LL NOT BE PARKED OR LOCATED-VATHIN . THE ODRIPLINES OF OAKS THAT
ARE. JO BE ‘PRESERYED.
E) SOIL SURFACE REMOVAL GREATER THAN ONE FOOT SHALL NOT OCCUR
WITHIN THE DRIPLINES OF DESIGNATED LANDMARK OAK GROVES.
F) NO COMPACTED FILL oR PAVING SHALL BE PLACED WITHIN THE DRIPLINES
OF LANDMARK OAK GROVES AND NO LOOSE EARTHEN FILL GREATER THAN ONE
FOOT DEEP SHALL BE PLACED WITHIN THE DRIP LINES OF LANDMARK OAK
GROVES. we c,
a or One
G) WITHIN THE PERMITTED MUSDA CONSTRUCTION AREA, TRENCHING WITHIN
THE ROOT ZONE OF OAKS SHALL BE KEPT AS FAR AWAY FROM THE TRUNK
AS POSSIBLE TO MINIMIZE, IMPAIRMENT OF THE TREES STABILITY AND THEIR
ABILITY TO OBTAIN MOISTURE AND NUTRIENTS. OUTSIDE OF THE PERMITTED
MUSDA CONSTRUCTION, UNDERGROUND UTILITY LINE TRENCHING SHALL NOT
OCCUR WITHIN THE DRIP LINES OF OAKS TO BE PRESERVED. IF THIS CANNOT
BE AVOIDED, THE TRENCH SHALL BE DUG BY HAND, AVOIDING THE ROOTS, OR
BORED AT LEAST THREE FEET DEEP AND TRENCHED LATERALLY FROM THENCE
UNLESS THE TREES ARE ADDED TO A LIST OF OAKS TO BE MITIGATED
THROUGH PLANTING OR RESTORATION.
H) PAVING SHALL NOT BE PLACED WITHIN THE DRIPLINE OF LANDMARK OAK
GROVES.
DOCUMENT NO sLQOQRCOB tay j
1) NO IRRIGATION OR ORNAMENTAL PLANTINGS REQUIRING REGULAR IRRIGATION FROM OVERHEAD
IRRIGATION SYSTEMS SHALL BE INSTALLED WITHIN THE DRIPLINES OF LANDMARK OAK GROVES.
MULCHES OR DROUGHT TOLERANT, NON-IRRIGATED OR DRIP-/IRRIGATED PLANTINGS ARE SUITABLE
WITHIN THESE DRIPLINES.
J) IF PRUNING (BEYOND THE REMOVAL OF SMALL OR DEAD BRANCHES) IS REQUIRED FOR
CLEARANCE FOR EQUIPMENT IN CONSTRUCTION AREAS, OR ALONG DRIVEWAYS AND AROUND
STRUCTURES, PRUNING FOR WINTER DECIDUOUS OAKS (BLACK, BLUE, AND VALLEY OR “WHITE”
OAK) SHALL ONLY BE DONE DURING THE WINTER DORMANT PERIOD AND DURING JULY AND
AUGUST FOR EVERGREEN OAKS (INTERIOR LIVE AND CANYON LIVE OAKS, AND MADRONES). LIMBS
LARGER THAN TWO INCHES SHALL BE CUT IN THREE STEPS TO AVOID TEARING THE BARK,
DAMAGING THE TRUNK, OR SPLITTING THE BRANCH, THE FIRST CUT SHALL BE MADE ON THE
UNDERSIDE OF THE BRANCH ONE TO TWO FEET FROM THE CROTCH. THE BRANCH SHALL BE CUT
ABOUT 1/4 WAY THROUGH UNTIL THE SAW STARTS TO BIND. THE NEXT CUT SHALL BE MADE ON
TOP WITHIN A FEW INCHES, FARTHER OUT THAN THE FIRST AND THE LIMB SHALL BE SAWN UNTIL
IT BREAKS OFF. THE THIRD CUT SHALL BE MADE AT THE CROTCH MAKING AS SMALL A WOUND
AS POSSIBLE. TO AVOID LEAVING A STUB THAT IS SLOW TO CALLOUS, THE CUT=SHALL BE MADE
JUST BEYOND THE BARK RIDGE OR BRANCH COLLAR.
MITIGATION MEASURE 7C: PROVIDE LANDOWNERS WITH OAK MANAGEMENT GUIDE. THE
SUPPLEMENTAL MAP TO BE RECORDED WITH THE PARCEL MAP SHALL ADVISE FUTURE LANDOWNERS
OF THE AVAILABILITY OF THE LANDOWNER GUIDE LIVING AMONG THE OAKS: A MANAGEMENT GUIDE
FOR LANDOWNERS, WHICH PROVIDES INFORMATION AND GUIDELINES FOR PROTECTING OAKS AFTER
CONSTRUCTION IS COMPLETE. PRIOR TO MAP RECORDATION, A COPY OF THE PREPARED
INFORMATION SHALL BE SUBMITTED TO THE PLANNING DEPARTMENT TO BE MAINTAINED IN THE
PROJECT FILE.
MITIGATION MEASURE 7D: PROVIDE COPIES OF PERMIT CONDITIONS AND MITIGATION MEASURES TO
CONTRACTORS. TO ENSURE THE PROPER AND TIMELY IMPLEMENTATION OF ALL MITIGATION
MEASURES CONTAINED IN THIS REPORT, AS WELL AS THE TERMS AND CONDITIONS OF ANY OTHER
REQUIRED PERMITS, THE APPLICANT SHALL DISTRIBUTE COPIES OF THESE MITIGATION MEASURES
AND PERMIT REQUIREMENTS TO THE CONTRACTORS AND THEIR WORKS PRIOR TO GRADING AND
CONSTRUCTION. .
DEPARTMENT OF TRANSPORTATION & SANITATION
‘A ROAD IMPROVEMENT FEE IN ACCORDANCE WITH NEVADA COUNTY ORDINANCE NO. 1829,
CREATING AND ESTABLISHING THE AUTHORITY FOR IMPOSING AND CHARGING A ROAD IMPROVEMENT .
FEE WITH THE UNINCORPORATED TERRITORY OF NEVADA COUNTY, WILL BE LEVIED AT THE ISSUANCE
OF BUILDING PERMITS FOR EACH PARCEL CREATED BY THE MAP, AND WILL BE BASED ON THE
LATEST FEE SCHEDULE ADOPTED BY THE NEVADA COUNTY BOARD OF SUPERVISORS.”
‘A ROAD MAINTENANCE AGREEMENT FOR SIERRA SPRINGS ROAD IS ON FILE, RECORDED AS
HAZARDS/HAZARDOUS MATERIALS:
HAZARDS/HAZARDOUS MATERIALS: THE FOLLOWING MITIGATION MEASURE SHALL BE INCLUDED AS
NOTE ON ALL GRADING/IMPROVEMENT PLANS:
MITIGATION MEASURE 9A. PROVIDE SPARK ARRESTERS ON ALL CONSTRUCTION EQUIPMENT. PER
THE REQUIREMENTS OF PUBLIC RESOURCES CODE 4442, PRIOR TO ISSUANCE OF A GRADING
PERMIT FOR OPERATION OF ANY INTERNAL COMBUSTION ENGINE ON ANY FOREST-, BRUSH-, OR
GRASS-COVERED LAND, THE PROJECT APPLICANT SHALL INCLUDE A NOTE ON CONSTRUCTION
PLANS THAT INTERNAL COMBUSTION ENGINES SHALL BE EQUIPPED WITH AN OPERATIONAL SPARK
ARRESTER, OR THE ENGINE MUST BE EQUIPPED FOR THE PREVENTION OF FIRE. THESE PLANS
SHALL BE REVIEWED AND APPROVED BY THE PLANNING DEPARTMENT PRIOR TO PERMIT ISSUANCE.
SUPPLEMENTAL INFORMATION SHEET
PARCEL MAP
AND
BOUNDARY LINE ADJUSTMENT
FOR
PACHAUD-—PETERSON—RAINEY
BEING A PORTION OF THE SOUTHEAST ONE QUARTER
OF SECTION 1, T. 16N., R. 8 E., MDM
IN THE UNINCORPORATED TERRITORY OF
THE COUNTY OF NEVADA
STATE OF CALIFORNIA
S. & E. ENGINEERING CO.
NEVADA CITY
SCALE AS SHOWN
CALIFORNIA
SEPTEMBER, 2008
SHEET: 4 OF 4
PM a0/19