Search Nevada County Historical Archive
Enter a name, company, place or keywords to search across this item. Then click "Search" (or hit Enter).
To search for an exact phrase, use "double quotes", but only after trying without quotes. To exclude results with a specific word, add dash before the word. Example: -Word.

Collection: Maps > Nevada County Recorders Maps

Nevada County Recorders Subdivision Maps Book 8 (914 images)

Go to the Archive Home
Go to Thumbnail View of this Item
Go to Single Page View of this Item
Download the Image
Copy the Page Text to the Clipboard
Don't highlight the search terms on the Image
Show the Page Image
Show the Image Page Text
Share this Page - Copy to the Clipboard
Reset View and Center Image
Zoom Out
Zoom In
Rotate Left
Rotate Right
Toggle Full Page View
Flip Image Horizontally
More Information About this Image
Get a Citation for Page or Image - Copy to the Clipboard
Go to the Previous Page (or Left Arrow key)
Go to the Next Page (or Right Arrow key)
Page: of 914  
Loading...
Subdivision Book 8, pg. 109 (2003)
Catalog #: NC Recorders Map Subdivision 08-109-6
Pine Forest Truckee LLC. T17N R16E Sec. 10. Pioneer Trail. Comstock Dr.. Industrial Way. Granite Dr.. Saddleback Dr.. Pine Forest at Truckee Phase 2

Date: 2003
Scanned on: 2010-05-18 07:41:44
File Size: 2.29 MB
Dimensions (pixels): 8,259 x 5,525
Print Sizes:
  • 4" x 6" = 2065 dpi,
  • 5" x 7" = 1652 dpi,
  • 8" x 10" = 1032 dpi
  • FINAL MAP NO. 0-06 35,243 sq.ft. PINE FOREST wg6°34'04"E ___$89°57°03"W 441.01' 115.92" T At Truckee PHASE 2 BEING A PORTION OF THE N. 1/2 SECTION 10, TOWNSHIP 17 NORTH, RANGE 16 EAST, M.D.M., IN THE TOWN OF TRUCKEE, NEVADA COUNTY, CALIFORNIA. JULY, 2003 SCALE: 1"=60' wn = ror) A]. ro) NTS a & ele PLANNING & ENGINEERING, INC. 22,710 sq.ft. LOT "G" 125.59 acres SEE NOTE 5 <0, “Tl 8/SUB/98 S $22°52'13"W w N05°32'10"E 242.52" 140 LITTON DRIVE, SUITE 240 @RASS VALLEY, CA 95946 10800 DONNER PASS ROAD, SUITE 302 TRUCKEE, CA 96161 —— PHASE 1 BOUNDARY PHASE 1 ‘Og: R.R. SPIKE , 3050 TAMPED P.L.S. : : 4332 PER-RINE___FOREST PHASE 1 SEO FINAL MAP we SCALE! 1” = 60! PHASE 1 BOUNDARY Cw oto E 100 y CURVE TABLE CURVE . LENGTH . RADIUS DELTA C9 26.52 530.00 2°52'01" C10 27.13 280.00 5°33'04" SEE SHEET 2 FOR BASIS OF BEARINGS & OVERALL BOUNDARY AND SHEET 1 FOR NOTES. LEGEND: @ FOUND 5/8" REBAR W\ CAP STAMPED "P.L.S. 4332" PER PHASE 1 MAP XX SETR.R. SPIKE STAMPED "PLS 4332” O SET 5/8" REBAR W/ CAP STAMPED "P.L.S. 4332" —~— NOTHING FOUND, DIMENSION POINT “T.D.P.U.D." TRUCKEE DONNER PUBLIC UTILITY DISTRICT "S.E.". SLOPE EASEMENT "S.S.E." SNOW STORAGE EASEMENT "D.E." DRAINAGE EASEMENT "PT&T" PACIFIC TELEGRAPH & TELEPHONE CO. "P.U.E." PUBLIC UTILITY EASEMENT SHEET 6 OF 6 DP SUB YIO7